During the floods two culverts, as well as the approaches to the
bridge across the Levhuvhu River, were washed away.
The design
provided for the reconstruction of the culverts the bridge approaches,
side-rails for the bridge, the installation of sub-surface drainage,
the construction of additional culverts as well as the re-gravelling
of a 4km section of the road.
|